Winford school is located directly under the flight path of Bristol Airport, as such noise ingress is a significant issue. During the design stage of this building several design options where reviewed.
The school is a prime example of the versatility of the NVA and MACH Acoustics. Facade ventilation is incorporated through window and horizontal louvres. Cross ventilation is applied through internal benches and exhausted through atrium vents.
For the design of this building cost was a primary factor. There was a desire to naturally ventilate but under the flight path of Bristol Airport and with cost limits it was a challenge acoustically.
A full natural ventilation strategy was designed in partnership with Stride Treglown Architects. Air would enter the building through openable windows and horizontal louvred ducts – controlled by a BMS – ventilate classrooms and exit through the roof of a central atrium known as the ‘heart’. Cross ventilators were designed between floors, discretely ducted within ground level benches – maximising building usage.
The central ‘heart’ of the building includes a plenum, where the hot air will exit the building. The design included a NVA bulkhead, mounted with BMS controlled actuated windows.
The build received a BREEAM ‘Very Good’ rating and will generate a minimum of 15% of predicted energy consumption, thanks in part to the well executed natural ventilation system.